Digital Billboards for the New Terminal at the Gelendzhik Airport

The end of 2021 marked our company with the implementation of several major projects, one of which was the installation of ready-to-operate Digital Billboards in the new terminal at the Gelendzhik Airport

The Billboards were installed inside and outside the airport. The biggest of them is a giant 30.5 meters long and 6 meters high. In addition to this, billboards of 2 × 10 m and 31.5 × 1 m were installed inside. They all have 2.6 mm pixel pitch and a display intensity of 1,000 CD, providing perfect brightness and clarity of the image.

On the outside, in the surrounding area, we installed two 3 × 4 digital billboards, three 2.8 × 1.4 m Digital Pylons with 4 mm pixel pitch. 6 Citylights were installed as well.

All the constructions are produced and manufactured by our company and installed by our specialists. As a result of the work performed, each construction was successfully tested and well-executed work received praise and commendations.

The LED screens were installed using cabinets and modules of Leyard’s Nev-gold series with a gold conductor and an extended warranty of 5 years.

← Back to all news